Project Details

Location:

Port Arthur, TX

Category:

Fabrication, Heavy Haul

About

草莓传媒在线观看. fabricated and transported this Fractionator Tower, a massive vessel measuring 258 feet in length, with a 22-foot internal diameter and a weight of 1.22 million pounds.

]]>
2 Million Barrel – Refined Products Terminal /portfolio/2-million-barrel-refined-products-terminal/ Wed, 06 Nov 2024 17:35:33 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11551

Project Details

Location:

Mount Belvieu, Texas

Category:

Tanks, Industrial, Fabrication

About

The Energy Cedar Bayou Terminal is located outside of Mount Belvieu, Baytown, Texas. 草莓传媒在线观看. completed the ground work preparation of the site and foundations for the refined products storage tanks, pump/piping manifolds, buildings and structural pipe rack steel, construction of the three 148.5鈥 x 48鈥 and three 164鈥 x 48鈥 storage tanks, setting of all equipment including pumps, the fabrication, installation and testing of the piping, including tie-ins to the Colonial pipelines and the installation and testing of the electrical power and control systems. The work commenced in January 2008 and was completed in October 2009 and a total of 500,800 hours of direct labor were expended.

]]>
OSBL Module Assembly /portfolio/osbl-module-assembly/ Wed, 06 Nov 2024 17:31:36 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11539

Project Details

Location:

Roxana, Illinois

Category:

Fabrication, Modules

About

The Wood River Refinery is located at Roxana, Illinois and is completing an expansion to increase capacity from 306,000 BPD to 356,000 BPD by 2011, making it the sixth largest domestic refinery.

草莓传媒在线观看. completed the fabrication and assembly of 101 pipe rack modules, with installed pipe, to support this expansion at our two Louisiana facilities.听 67 were completed at Amelia, Morgan City and 34 at Belle Chase, New Orleans for a total of 4,080 Tons.听 Dimensional control by total station was used to ensure construction tolerances were met and when all units were installed there were no miss-fits or errors to be rectified.听 Work started in October 2008, the first shipment was made in March 2009 and the final shipment completed in November 2009 utilizing barge for the large units and truck for the small ones.听 A total of 274,000 hours of direct labor were expended.

]]>
Nitriles Facility /portfolio/nitriles-facility/ Wed, 06 Nov 2024 17:27:33 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11527

Project Details

Location:

Green Lake, Port Lavaca, TX

Category:

Fabrication, Industrial Construction

About

The Nitriles facility located at Green Lake, Port Lavaca, Texas, produces acrylonitrile and acetonitrile, chemicals used in the production of acrylic and carbon fibers and the pharmaceutical industries. 草莓传媒在线观看. completed the fabrication and erection of the 4th Reactor Train utilizing major equipment that was dismantled and transported from the Sterling Chemicals plant in Texas City. The Bay work scope included refurbishment of some of the used equipment with specialty items such as heat exchangers and compressors being sent out to vendors as well as fitness for service inspection of used large bore process pipe and structural steel. Also included were the civil works, structural steel erection, piping fabrication and erection, electrical and instrumentation and painting and scaffold services.听 The total completion took 21 months and 885,000 hours of direct labor were expended.

]]>
Nickel Processing Modules /portfolio/nickel-processing-modules/ Wed, 06 Nov 2024 17:16:20 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11500

Project Details

Location:

Newfoundland, Canada

Category:

Fabrication, Modules

About

Fabrication and Assembly of over 96 鈥 20,000 tons of Piperack/Utility Modules for a Nickel Processing Facility

]]>
NGL Fractionation Towers /portfolio/ngl-fractionation-towers/ Wed, 06 Nov 2024 17:10:30 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11484

Project Details

Location:

Mont Belvieu, TX

Category:

Fabrication, Heavy Haul

About

草莓传媒在线观看. (Berry Fabricators) has fabricated two sets of four NGL Fractionators for a valued Gulf Coast client. The projects involved comprehensive mechanical code calculations, procurement, fabrication, and delivery of the Trayed Towers, which included four specific towers: the Deethanizer (13.5鈥 I.D. x 172鈥 OAL, weighing 676,000 lbs.), the Depropanizer (12鈥 to 13鈥 I.D. x 188鈥 OAL, weighing 526,000 lbs.), the Debutanizer (10.5鈥 to 11.5鈥 I.D. x 165鈥 OAL, weighing 379,000 lbs.), and the Deisobutanizer (11.5鈥 I.D. x 229鈥 OAL, weighing 545,000 lbs.). Additionally, our scope of work included the loading and securement of the towers onto the transportation barge, barge shipment, offloading, and heavy hauling to the project site using Bay鈥檚 Nicolas self-propelled transporters (SPMTs).

]]>
Crude Stabilizer /portfolio/crude-stabilizer/ Wed, 06 Nov 2024 16:49:29 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11445

Project Details

Location:

Eagle Ford Shale

Category:

Modules, Fabrication, Offshore Fabrication, Heavy Civil Construction, Instrument & Electrical, Oilfield, Tanks

About

Turnkey construction of a 90,000 bpd Crude Stabilizer in the Eagle Ford, requiring 750,000 man-hours. Scope included Site Clearing through Mechanical completion. Bay self-performed all Civil, Mechanical, I&E, Tank Erection, and Equipment setting as well as offsite Pipe, Module, and NGL Vessel fabrication over the course of 34 months.

]]>
Process Module /portfolio/process-module/ Wed, 06 Nov 2024 16:42:22 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11435

Project Details

Location:

Offshore Nigeria

Category:

Fabrication, Offshore, Module

About

Fabrication and Assembly of 1,100-ton Oil Processing Module and two 200-ton Modules 鈥 conversion of a MODU to a MOPU for offshore production. Total project encompassed 300,000 man-hours.

]]>
Living Quarters /portfolio/living-quarters/ Wed, 06 Nov 2024 16:33:06 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11407

Project Details

Location:

Offshore Israel

Category:

Fabrication, Offshore

About

Design, Fabrication, Assembly & Outfitting of a 58-man Living Quarters for a production facility offshore Israel, encompassing 350,000 man-hours.

]]>