Industrial Construction – ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. A Total Solutions Industrial Contractor Tue, 12 Nov 2024 14:55:38 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 2 Million Barrel – Refined Products Terminal /portfolio/2-million-barrel-refined-products-terminal/ Wed, 06 Nov 2024 17:35:33 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11551

Project Details

Location:

Mount Belvieu, Texas

Category:

Tanks, Industrial, Fabrication

About

The Energy Cedar Bayou Terminal is located outside of Mount Belvieu, Baytown, Texas. ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. completed the ground work preparation of the site and foundations for the refined products storage tanks, pump/piping manifolds, buildings and structural pipe rack steel, construction of the three 148.5’ x 48’ and three 164’ x 48’ storage tanks, setting of all equipment including pumps, the fabrication, installation and testing of the piping, including tie-ins to the Colonial pipelines and the installation and testing of the electrical power and control systems. The work commenced in January 2008 and was completed in October 2009 and a total of 500,800 hours of direct labor were expended.Ìý

]]>
Nitriles Facility /portfolio/nitriles-facility/ Wed, 06 Nov 2024 17:27:33 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11527

Project Details

Location:

Green Lake, Port Lavaca, TX

Category:

Fabrication, Industrial Construction

About

The Nitriles facility located at Green Lake, Port Lavaca, Texas, produces acrylonitrile and acetonitrile, chemicals used in the production of acrylic and carbon fibers and the pharmaceutical industries. ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. completed the fabrication and erection of the 4th Reactor Train utilizing major equipment that was dismantled and transported from the Sterling Chemicals plant in Texas City. The Bay work scope included refurbishment of some of the used equipment with specialty items such as heat exchangers and compressors being sent out to vendors as well as fitness for service inspection of used large bore process pipe and structural steel. Also included were the civil works, structural steel erection, piping fabrication and erection, electrical and instrumentation and painting and scaffold services.Ìý The total completion took 21 months and 885,000 hours of direct labor were expended.Ìý

]]>