Modules – ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. A Total Solutions Industrial Contractor Tue, 12 Nov 2024 15:08:07 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 OSBL Module Assembly /portfolio/osbl-module-assembly/ Wed, 06 Nov 2024 17:31:36 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11539

Project Details

Location:

Roxana, Illinois

Category:

Fabrication, Modules

About

The Wood River Refinery is located at Roxana, Illinois and is completing an expansion to increase capacity from 306,000 BPD to 356,000 BPD by 2011, making it the sixth largest domestic refinery.Ìý

²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. completed the fabrication and assembly of 101 pipe rack modules, with installed pipe, to support this expansion at our two Louisiana facilities.Ìý 67 were completed at Amelia, Morgan City and 34 at Belle Chase, New Orleans for a total of 4,080 Tons.Ìý Dimensional control by total station was used to ensure construction tolerances were met and when all units were installed there were no miss-fits or errors to be rectified.Ìý Work started in October 2008, the first shipment was made in March 2009 and the final shipment completed in November 2009 utilizing barge for the large units and truck for the small ones.Ìý A total of 274,000 hours of direct labor were expended.Ìý

]]>
Power Plant Utility Modules /portfolio/power-plant-utility-modules/ Wed, 06 Nov 2024 17:20:36 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11517

Project Details

Location:

Queens, NY

Category:

Fabrication, Modules

About

This project involved the second phase expansion of the power station in Queens, New York, with ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. completing the fabrication and assembly of six process and utility pipe rack modules, weighing a total of 1,800 tons and including piping and valves up to 30 inches. The work was accomplished over an 8-month timeline, requiring 180,000 hours of direct labor. Bay loaded-out onto a customer-supplied barge, shipping the units from the Bay Corpus Christi facility for direct delivery to Queens, New York.Ìý

]]>
Nickel Processing Modules /portfolio/nickel-processing-modules/ Wed, 06 Nov 2024 17:16:20 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11500

Project Details

Location:

Newfoundland, Canada

Category:

Fabrication, Modules

About

Fabrication and Assembly of over 96 – 20,000 tons of Piperack/Utility Modules for a Nickel Processing FacilityÌý

]]>
Crude Stabilizer /portfolio/crude-stabilizer/ Wed, 06 Nov 2024 16:49:29 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11445

Project Details

Location:

Eagle Ford Shale

Category:

Modules, Fabrication, Offshore Fabrication, Heavy Civil Construction, Instrument & Electrical, Oilfield, Tanks

About

Turnkey construction of a 90,000 bpd Crude Stabilizer in the Eagle Ford, requiring 750,000 man-hours. Scope included Site Clearing through Mechanical completion. Bay self-performed all Civil, Mechanical, I&E, Tank Erection, and Equipment setting as well as offsite Pipe, Module, and NGL Vessel fabrication over the course of 34 months.

]]>
Process Module /portfolio/process-module/ Wed, 06 Nov 2024 16:42:22 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11435

Project Details

Location:

Offshore Nigeria

Category:

Fabrication, Offshore, Module

About

Fabrication and Assembly of 1,100-ton Oil Processing Module and two 200-ton Modules – conversion of a MODU to a MOPU for offshore production. Total project encompassed 300,000 man-hours.

]]>