Tanks – ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. A Total Solutions Industrial Contractor Tue, 12 Nov 2024 15:06:57 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 2 Million Barrel – Refined Products Terminal /portfolio/2-million-barrel-refined-products-terminal/ Wed, 06 Nov 2024 17:35:33 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11551

Project Details

Location:

Mount Belvieu, Texas

Category:

Tanks, Industrial, Fabrication

About

The Energy Cedar Bayou Terminal is located outside of Mount Belvieu, Baytown, Texas. ²ÝÝ®´«Ã½ÔÚÏß¹Û¿´. completed the ground work preparation of the site and foundations for the refined products storage tanks, pump/piping manifolds, buildings and structural pipe rack steel, construction of the three 148.5’ x 48’ and three 164’ x 48’ storage tanks, setting of all equipment including pumps, the fabrication, installation and testing of the piping, including tie-ins to the Colonial pipelines and the installation and testing of the electrical power and control systems. The work commenced in January 2008 and was completed in October 2009 and a total of 500,800 hours of direct labor were expended.Ìý

]]>
Crude Stabilizer /portfolio/crude-stabilizer/ Wed, 06 Nov 2024 16:49:29 +0000 https://dev.bayltd.com/?post_type=liquid-portfolio&p=11445

Project Details

Location:

Eagle Ford Shale

Category:

Modules, Fabrication, Offshore Fabrication, Heavy Civil Construction, Instrument & Electrical, Oilfield, Tanks

About

Turnkey construction of a 90,000 bpd Crude Stabilizer in the Eagle Ford, requiring 750,000 man-hours. Scope included Site Clearing through Mechanical completion. Bay self-performed all Civil, Mechanical, I&E, Tank Erection, and Equipment setting as well as offsite Pipe, Module, and NGL Vessel fabrication over the course of 34 months.

]]>